3150 Bay Road
  • Home
  • The Building
  • Floor Plans
  • Location
  • Life Science Hub
  • Contact

AN ENVIRONMENT FOR EVOLUTION

  • Designed by DGA Architects and Integral Group, specialists in facilities for life sciences, healthcare and technology
  • Highly efficient electrical HVAC systems, providing 12 air changes per hour in lab space
  • 2,000 amps power, plus 300 kw emergency back-up generator
  • 18’ – 23’ clear height open ceiling to both lab and office spaces
  • Dynamic View Glass throughout, automatically shades to control sunlight and heat load.
  • Four outdoor terraces plus Entrance Plaza
  • 20,000 sq. ft. of solar PV roof panels 
  • Fiber ready with service to dedicated 
  • MPOE room
  • Additional rooftop area for dedicated 
  • tenant equipment
  • Two shipping-receiving areas
  • Four EV charging stations​

LATEST LABORATORY DESIGN

Built to meet Microbiology and Genetic research laboratory needs with 12 air changes per hour, 6 fume hoods, 2000 amps power, 300KW emergency back-up generator, with dedicated shipping-receiving areas

OPEN STEEL & GLASS STRUCTURE

Wellness and green designed standards with solar power, dynamic glass, and four terraces
Picture
Picture
Picture

OPEN FLOOR PLAN

Flexible office layouts with large open laboratories filled with natural light

Picture
Picture
BEN PAUL
Vice Chairman
+1 650 401 2123
[email protected]
LIC #01210872​
GARY BOITANO  
Managing Director
+1 650 401 2122
[email protected]
LIC #01210872​
NICK WALDSMITH
Senior Associate
+1 650 320 0244
[email protected]
LIC #02148008​

Picture
3150 BAY ROAD | REDWOOD CITY
 ​​©2024 Cushman & Wakefield
Photo from shixart1985
  • Home
  • The Building
  • Floor Plans
  • Location
  • Life Science Hub
  • Contact